Our Services
Serving Houston-area schools, businesses, and Harris County facilities.
Complete lot layouts engineered for maximum capacity, traffic flow, and code compliance — measured, chalked, and painted to spec.
Faded lots brought back to life with crisp, durable traffic coatings that restore safety and curb appeal.
Handicap spaces, access aisles, ramps, and signage brought up to current federal and Texas accessibility standards.
Code-required fire lane marking, no-parking zones, and safety areas for schools and commercial properties.
Arrows, stop bars, crosswalks, speed bump markings, and pedestrian pathways that keep traffic moving safely.
Basketball courts, four-square, hopscotch, running tracks, and custom playground games for school campuses.
Color-coded curbs for fire zones, loading areas, visitor parking, and drop-off/pick-up lanes.
Numbered spaces, reserved wording, school logos, and mascot artwork painted with precision stencils.
Carpentry, drywall, painting, ceiling tiles, flooring, and the everyday repairs that keep facilities operational.
Sidewalks, building facades, dumpster pads, canopies, and play areas — cleaned, sanitized, and presentable.
Door adjustments, locksets, closers, hinges, and security hardware repaired or replaced.
Leak repairs, fixture replacement, drain clearing, and restroom maintenance. Work requiring a license is performed by licensed Texas plumbers.
Outlet and switch replacement, light fixtures, ballasts, and routine troubleshooting. Work requiring a license is performed by licensed Texas electricians.
Crack sealing, patching, and surface preparation — the foundation work that makes striping last.
Chain link, wood, and ornamental fencing repaired to keep campuses secure.
Inspection, adjustment, and repair of the mechanical equipment that moves material on site — plus scheduled upkeep to keep it running safely.
Partitions, desks, shelving, and casework assembled, installed, and reconfigured — offices and workspaces built or rearranged to your layout.
Scheduled walkthroughs and service plans that catch small issues before they become expensive ones.
Rapid response for urgent repairs — because a school or facility can't wait until next week.
Summer refreshes, classroom turnovers, and project punch lists completed on tight schedules.